Method of configuring a startup sequence of a load control system

Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ORCHOWSKI NEIL, VALENTA BRIAN R, PETRELLA JASON P, BLACK RICHARD L, HNATOW JOEL
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Power distribution systems that have a limited peak power capability or a high source impedance, such as site supply generators, are often susceptible to abnormal operation in response to the current drawn at power up from the loads connected to the power distribution system. The present invention provides a method of configuring a lighting control system to power up a plurality of the lighting loads in sequence to reduce stress on the power distribution system. The lighting control system includes a plurality of load control devices for controlling the electrical loads. The method comprising the steps of enabling a startup-delay mode in the load control devices, and determining a startup sequence having a plurality of event times for the electrical loads to turn on after the power distribution system has stabilized. A graphical user interface may be used to create a database defining the operation of the startup sequence.