Multi-tier material requirements flowdown generation
A method of producing a master sub-tier schedule for a Multi-tier Manufacturing Requirements Planning (MRP) system comprising the steps of populating a database with a plurality of identified part/supplier combinations for at least one finished part, populating the database with a plurality of sub-p...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method of producing a master sub-tier schedule for a Multi-tier Manufacturing Requirements Planning (MRP) system comprising the steps of populating a database with a plurality of identified part/supplier combinations for at least one finished part, populating the database with a plurality of sub-process steps associated with each of the at least one finished part, populating the database with at least one supplier responsible for each of the plurality of sub-process steps, populating the database with at least one lead time and at least one lot requirement associated with each of the plurality of sub-process steps, and sending notification to the primary consumer and the first tier supplier if necessitated by the reviewing of the master sub-tier schedule. |
---|