TIME SCHEDULE CONTROLLER AND PARTS AND HOUSING THEREFOR
A time schedule controller wherein the high limit index and the set point index respectively have members movable therewith and alignable in relation to each other only when the set point index reaches the setting of the high limit index. An actuator for terminating the operation of the set point in...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A time schedule controller wherein the high limit index and the set point index respectively have members movable therewith and alignable in relation to each other only when the set point index reaches the setting of the high limit index. An actuator for terminating the operation of the set point index in the rate of rise thereof is only actuated when the alignable members of the high limit index and the set point index that are operatively associated therewith are in their aligned relation thereof. |
---|