HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM

One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote site...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SANGHAMITRA, GUTHA STALIN, RAMGOPAL, NITHIN YADALLA, RATAKONDA, SHREYA, CHOPRA, NITISH
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SANGHAMITRA, GUTHA STALIN
RAMGOPAL, NITHIN YADALLA
RATAKONDA, SHREYA
CHOPRA, NITISH
description One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote sites in accordance with the portfolio level equipment schedules. A site level user is allowed to change a portfolio level equipment schedule and apply the changed portfolio level equipment schedule to one or more of the controllers of a remote site, resulting in an changed portfolio level equipment schedule. The portfolio level user is allowed to override the changed portfolio level equipment schedule at the first remote site and return to the portfolio level equipment schedule.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2024330803A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2024330803A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2024330803A13</originalsourceid><addsrcrecordid>eNrjZHDy8HQNcgxy9nD0UQh29nB1CfXx9HNXcPMPUvAN9QnxDPBxVQj2DHFVcAr19HEBSfk6-jm6u_q6-oUoBEcGh7j68jCwpiXmFKfyQmluBmU31xBnD93Ugvz41OKCxOTUvNSS-NBgIwMjE2NjAwsDY0dDY-JUAQC9iSxA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>SANGHAMITRA, GUTHA STALIN ; RAMGOPAL, NITHIN YADALLA ; RATAKONDA, SHREYA ; CHOPRA, NITISH</creator><creatorcontrib>SANGHAMITRA, GUTHA STALIN ; RAMGOPAL, NITHIN YADALLA ; RATAKONDA, SHREYA ; CHOPRA, NITISH</creatorcontrib><description>One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote sites in accordance with the portfolio level equipment schedules. A site level user is allowed to change a portfolio level equipment schedule and apply the changed portfolio level equipment schedule to one or more of the controllers of a remote site, resulting in an changed portfolio level equipment schedule. The portfolio level user is allowed to override the changed portfolio level equipment schedule at the first remote site and return to the portfolio level equipment schedule.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241003&amp;DB=EPODOC&amp;CC=US&amp;NR=2024330803A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20241003&amp;DB=EPODOC&amp;CC=US&amp;NR=2024330803A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SANGHAMITRA, GUTHA STALIN</creatorcontrib><creatorcontrib>RAMGOPAL, NITHIN YADALLA</creatorcontrib><creatorcontrib>RATAKONDA, SHREYA</creatorcontrib><creatorcontrib>CHOPRA, NITISH</creatorcontrib><title>HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM</title><description>One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote sites in accordance with the portfolio level equipment schedules. A site level user is allowed to change a portfolio level equipment schedule and apply the changed portfolio level equipment schedule to one or more of the controllers of a remote site, resulting in an changed portfolio level equipment schedule. The portfolio level user is allowed to override the changed portfolio level equipment schedule at the first remote site and return to the portfolio level equipment schedule.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHDy8HQNcgxy9nD0UQh29nB1CfXx9HNXcPMPUvAN9QnxDPBxVQj2DHFVcAr19HEBSfk6-jm6u_q6-oUoBEcGh7j68jCwpiXmFKfyQmluBmU31xBnD93Ugvz41OKCxOTUvNSS-NBgIwMjE2NjAwsDY0dDY-JUAQC9iSxA</recordid><startdate>20241003</startdate><enddate>20241003</enddate><creator>SANGHAMITRA, GUTHA STALIN</creator><creator>RAMGOPAL, NITHIN YADALLA</creator><creator>RATAKONDA, SHREYA</creator><creator>CHOPRA, NITISH</creator><scope>EVB</scope></search><sort><creationdate>20241003</creationdate><title>HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM</title><author>SANGHAMITRA, GUTHA STALIN ; RAMGOPAL, NITHIN YADALLA ; RATAKONDA, SHREYA ; CHOPRA, NITISH</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2024330803A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SANGHAMITRA, GUTHA STALIN</creatorcontrib><creatorcontrib>RAMGOPAL, NITHIN YADALLA</creatorcontrib><creatorcontrib>RATAKONDA, SHREYA</creatorcontrib><creatorcontrib>CHOPRA, NITISH</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SANGHAMITRA, GUTHA STALIN</au><au>RAMGOPAL, NITHIN YADALLA</au><au>RATAKONDA, SHREYA</au><au>CHOPRA, NITISH</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM</title><date>2024-10-03</date><risdate>2024</risdate><abstract>One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote sites in accordance with the portfolio level equipment schedules. A site level user is allowed to change a portfolio level equipment schedule and apply the changed portfolio level equipment schedule to one or more of the controllers of a remote site, resulting in an changed portfolio level equipment schedule. The portfolio level user is allowed to override the changed portfolio level equipment schedule at the first remote site and return to the portfolio level equipment schedule.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2024330803A1
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T20%3A13%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SANGHAMITRA,%20GUTHA%20STALIN&rft.date=2024-10-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2024330803A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true