HIERARCHAL SCHEDULING FOR MULTIPLE SITE BUILDING MANAGEMENT SYSTEM
One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote site...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | One or more screens are displayed that allow a portfolio level user to create one or more portfolio level equipment schedules that are distributed from a multi-site BMS to one or more controllers at remote sites, which are configured to control operation of corresponding equipment at the remote sites in accordance with the portfolio level equipment schedules. A site level user is allowed to change a portfolio level equipment schedule and apply the changed portfolio level equipment schedule to one or more of the controllers of a remote site, resulting in an changed portfolio level equipment schedule. The portfolio level user is allowed to override the changed portfolio level equipment schedule at the first remote site and return to the portfolio level equipment schedule. |
---|