TOP-DOWN CONSTRUCTION METHOD FOR MULTI-STOREY BASEMENT WITH FULL STEEL STRUCTURE
A top-down construction method for a multi-storey basement with a full steel structure is provided, including: S1, constructing a diaphragm wall permanent structure; S2. conducting an open excavation, then constructing a first layer structural beam and slab; S3. conducting an underground excavation...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A top-down construction method for a multi-storey basement with a full steel structure is provided, including: S1, constructing a diaphragm wall permanent structure; S2. conducting an open excavation, then constructing a first layer structural beam and slab; S3. conducting an underground excavation on an underground second layer earthwork, then constructing structural beam and slab and vertical shear wall on underground first layer; S4. excavating earthworks from an underground third layer to an underground N−1 layer, and constructing structural beams and slabs and vertical shear walls; S5. conducting the underground excavation on an underground N layer earthwork, and constructing a two-span structural steel beam; S6. conducting the underground excavation on earthworks of bottom plate layer, constructing remaining structural beams and slabs and vertical shear wall; S7. conducting the underground excavation on earthworks of bearing platform and water collection well; S8. constructing earth intakes of the podium and the basement. |
---|