AUTOMATIC STAGING OF MULTIPLE HVAC SYSTEMS DURING A PEAK DEMAND RESPONSE
A system includes multiple HVAC systems. After receiving a demand request, a multiple-system controller a first anticipated power consumption associated with operating a first HVAC system at a first temperature setpoint during a future period of time of the demand response request and a second antic...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A system includes multiple HVAC systems. After receiving a demand request, a multiple-system controller a first anticipated power consumption associated with operating a first HVAC system at a first temperature setpoint during a future period of time of the demand response request and a second anticipated power consumption associated with operating a second HVAC system at a second temperature setpoint during the future period of time. Based at least in part on the first and the second anticipated power consumptions, a staging schedule is determined that indicates when to operate the first and second HVAC systems. |
---|