WELL FRACTURE SYSTEMS AND METHODS
A method for performing simultaneous operations at a wellsite comprising two or more adjacent wellheads, each respectively connected to a well, may include the following steps: providing a fluid supply via upstream equipment to an intermediate supply point; fluidly connecting the intermediate supply...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for performing simultaneous operations at a wellsite comprising two or more adjacent wellheads, each respectively connected to a well, may include the following steps: providing a fluid supply via upstream equipment to an intermediate supply point; fluidly connecting the intermediate supply point to a single wellhead, the fluidly connecting comprising connecting a first end of a flexible pipe to the intermediate supply point and a second end of the flexible pipe to a first wellhead; performing a wellbore operation on a first well using the fluid supply from the upstream equipment supplied to the first wellhead; disconnecting the second end of the flexible pipe from the first wellhead; and connecting the second end of the flexible pipe to a second wellhead. |
---|