CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE

A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sour...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KABRICH, Todd R, OTTEN, Casey A, MABE, Brandon J, HERLEHY, Jason T, PUBLES, Andy, CONVERSE, Perry D
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KABRICH, Todd R
OTTEN, Casey A
MABE, Brandon J
HERLEHY, Jason T
PUBLES, Andy
CONVERSE, Perry D
description A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sources electrically connected to a first subset of the one or more fracturing rigs, or one or more fuel sources fluidly connected to a second subset of the one or more fracturing rigs. The hydraulic fracturing system may further include one or more missile valves, one or more zipper valves, one or more well head valves, and one or more well heads. The method may further include controlling, based on an operation schedule for the hydraulic fracturing system and based on monitoring the operation or the state, the state or equipment changes.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2023287768A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2023287768A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2023287768A13</originalsourceid><addsrcrecordid>eNrjZPBw9vcLCfL38fH0c1dw8wn1dFEICHINDg4NclVwDFFwVAh39fFR8HB1dFFwcgx2dVHw91Nw9FPwD3ANcgzxBHKCnT1cXUJ9XHkYWNMSc4pTeaE0N4Oym2uIs4duakF-fGpxQWJyal5qSXxosJGBkbGRhbm5mYWjoTFxqgCPVy16</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE</title><source>esp@cenet</source><creator>KABRICH, Todd R ; OTTEN, Casey A ; MABE, Brandon J ; HERLEHY, Jason T ; PUBLES, Andy ; CONVERSE, Perry D</creator><creatorcontrib>KABRICH, Todd R ; OTTEN, Casey A ; MABE, Brandon J ; HERLEHY, Jason T ; PUBLES, Andy ; CONVERSE, Perry D</creatorcontrib><description>A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sources electrically connected to a first subset of the one or more fracturing rigs, or one or more fuel sources fluidly connected to a second subset of the one or more fracturing rigs. The hydraulic fracturing system may further include one or more missile valves, one or more zipper valves, one or more well head valves, and one or more well heads. The method may further include controlling, based on an operation schedule for the hydraulic fracturing system and based on monitoring the operation or the state, the state or equipment changes.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230914&amp;DB=EPODOC&amp;CC=US&amp;NR=2023287768A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230914&amp;DB=EPODOC&amp;CC=US&amp;NR=2023287768A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KABRICH, Todd R</creatorcontrib><creatorcontrib>OTTEN, Casey A</creatorcontrib><creatorcontrib>MABE, Brandon J</creatorcontrib><creatorcontrib>HERLEHY, Jason T</creatorcontrib><creatorcontrib>PUBLES, Andy</creatorcontrib><creatorcontrib>CONVERSE, Perry D</creatorcontrib><title>CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE</title><description>A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sources electrically connected to a first subset of the one or more fracturing rigs, or one or more fuel sources fluidly connected to a second subset of the one or more fracturing rigs. The hydraulic fracturing system may further include one or more missile valves, one or more zipper valves, one or more well head valves, and one or more well heads. The method may further include controlling, based on an operation schedule for the hydraulic fracturing system and based on monitoring the operation or the state, the state or equipment changes.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPBw9vcLCfL38fH0c1dw8wn1dFEICHINDg4NclVwDFFwVAh39fFR8HB1dFFwcgx2dVHw91Nw9FPwD3ANcgzxBHKCnT1cXUJ9XHkYWNMSc4pTeaE0N4Oym2uIs4duakF-fGpxQWJyal5qSXxosJGBkbGRhbm5mYWjoTFxqgCPVy16</recordid><startdate>20230914</startdate><enddate>20230914</enddate><creator>KABRICH, Todd R</creator><creator>OTTEN, Casey A</creator><creator>MABE, Brandon J</creator><creator>HERLEHY, Jason T</creator><creator>PUBLES, Andy</creator><creator>CONVERSE, Perry D</creator><scope>EVB</scope></search><sort><creationdate>20230914</creationdate><title>CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE</title><author>KABRICH, Todd R ; OTTEN, Casey A ; MABE, Brandon J ; HERLEHY, Jason T ; PUBLES, Andy ; CONVERSE, Perry D</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2023287768A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>KABRICH, Todd R</creatorcontrib><creatorcontrib>OTTEN, Casey A</creatorcontrib><creatorcontrib>MABE, Brandon J</creatorcontrib><creatorcontrib>HERLEHY, Jason T</creatorcontrib><creatorcontrib>PUBLES, Andy</creatorcontrib><creatorcontrib>CONVERSE, Perry D</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KABRICH, Todd R</au><au>OTTEN, Casey A</au><au>MABE, Brandon J</au><au>HERLEHY, Jason T</au><au>PUBLES, Andy</au><au>CONVERSE, Perry D</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE</title><date>2023-09-14</date><risdate>2023</risdate><abstract>A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sources electrically connected to a first subset of the one or more fracturing rigs, or one or more fuel sources fluidly connected to a second subset of the one or more fracturing rigs. The hydraulic fracturing system may further include one or more missile valves, one or more zipper valves, one or more well head valves, and one or more well heads. The method may further include controlling, based on an operation schedule for the hydraulic fracturing system and based on monitoring the operation or the state, the state or equipment changes.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2023287768A1
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T05%3A59%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KABRICH,%20Todd%20R&rft.date=2023-09-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2023287768A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true