CONTROLLING FLUID PRESSURE AT A WELL HEAD BASED ON AN OPERATION SCHEDULE
A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sour...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method may include monitoring, for a well head of a hydraulic fracturing system, an operation or a state of one or more subsystems of the hydraulic fracturing system. The hydraulic fracturing system may include one or more fracturing rigs, one or more blending equipment, and one or more power sources electrically connected to a first subset of the one or more fracturing rigs, or one or more fuel sources fluidly connected to a second subset of the one or more fracturing rigs. The hydraulic fracturing system may further include one or more missile valves, one or more zipper valves, one or more well head valves, and one or more well heads. The method may further include controlling, based on an operation schedule for the hydraulic fracturing system and based on monitoring the operation or the state, the state or equipment changes. |
---|