USAGE BASED MAINTENANCE SCHEDULING SYSTEM
A process for scheduling engine inspection for a gas turbine engine includes computing an expected damage increment based on aircraft usage data of a single flight, computing a cumulative expected damage by summing the expected damage increment with a total set of historical expected damage incremen...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A process for scheduling engine inspection for a gas turbine engine includes computing an expected damage increment based on aircraft usage data of a single flight, computing a cumulative expected damage by summing the expected damage increment with a total set of historical expected damage increments since a previous maintenance, and determining an aggregate risk of failure based on the computed cumulative expected damage. A manual inspection is signaled when the aggregate risk of failure exceeds an acceptable risk threshold. |
---|