USAGE BASED MAINTENANCE SCHEDULING SYSTEM

A process for scheduling engine inspection for a gas turbine engine includes computing an expected damage increment based on aircraft usage data of a single flight, computing a cumulative expected damage by summing the expected damage increment with a total set of historical expected damage incremen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Kachel, Eric D, Brown, Alex J, Owen, William D, Roto Coleman, Emily Carolyn, Hall, Benjamin D, Santor, Cami
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A process for scheduling engine inspection for a gas turbine engine includes computing an expected damage increment based on aircraft usage data of a single flight, computing a cumulative expected damage by summing the expected damage increment with a total set of historical expected damage increments since a previous maintenance, and determining an aggregate risk of failure based on the computed cumulative expected damage. A manual inspection is signaled when the aggregate risk of failure exceeds an acceptable risk threshold.