INTEGRATED ROCK MECHANICS LABORATORY FOR PREDICTING STRESS-STRAIN BEHAVIOR

Partially coupling a geomechanical simulation with a reservoir simulation facilitates predicting strain behavior for a reservoir from production and injection processes. A method comprises generating a geomechanical model based on a mechanical earth model that represents a subsurface area. The geome...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Kumar, Amit, Abass, Hazim H, Dusterhoft, Ronald Glen
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Partially coupling a geomechanical simulation with a reservoir simulation facilitates predicting strain behavior for a reservoir from production and injection processes. A method comprises generating a geomechanical model based on a mechanical earth model that represents a subsurface area. The geomechanical model indicates a division of the mechanical earth model into a plurality of grid cells that each correspond to a different volume of the subsurface area. Based on a first virtual compaction experiment with the geomechanical model, compaction curves are generated. The compaction curves represent porosity as a function of stress. The compaction curves are converted from porosity as a function of stress to porosity as a function of pore pressure. The geomechanical model is partially coupled to a reservoir simulation model using the converted compaction curves.