Well Construction Management and Decision Support System
A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a pre...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hildebrand, Ginger Vinyard Coffman, Chunling Gu Isangulov, Rustam |
description | A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a predetermined value of the well state parameter is determined. When the difference exceeds a selected threshold a modified well plan is calculated comprising at least one drilling task to enable construction of at least part of the wellbore to conform to the modified well plan. The at least one drilling task is displayed to a user. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2021324727A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2021324727A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2021324727A13</originalsourceid><addsrcrecordid>eNrjZLAIT83JUXDOzysuKSpNLsnMz1PwTcxLTE_NTc0rUUjMS1FwSU3OLAaJB5cWFOQXlSgEVxaXpObyMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjAyNDYyMTcyNzR0Nj4lQBAMqvL04</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Well Construction Management and Decision Support System</title><source>esp@cenet</source><creator>Hildebrand, Ginger Vinyard ; Coffman, Chunling Gu ; Isangulov, Rustam</creator><creatorcontrib>Hildebrand, Ginger Vinyard ; Coffman, Chunling Gu ; Isangulov, Rustam</creatorcontrib><description>A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a predetermined value of the well state parameter is determined. When the difference exceeds a selected threshold a modified well plan is calculated comprising at least one drilling task to enable construction of at least part of the wellbore to conform to the modified well plan. The at least one drilling task is displayed to a user.</description><language>eng</language><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MINING ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PHYSICS ; REGULATING</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211021&DB=EPODOC&CC=US&NR=2021324727A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211021&DB=EPODOC&CC=US&NR=2021324727A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hildebrand, Ginger Vinyard</creatorcontrib><creatorcontrib>Coffman, Chunling Gu</creatorcontrib><creatorcontrib>Isangulov, Rustam</creatorcontrib><title>Well Construction Management and Decision Support System</title><description>A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a predetermined value of the well state parameter is determined. When the difference exceeds a selected threshold a modified well plan is calculated comprising at least one drilling task to enable construction of at least part of the wellbore to conform to the modified well plan. The at least one drilling task is displayed to a user.</description><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MINING</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAIT83JUXDOzysuKSpNLsnMz1PwTcxLTE_NTc0rUUjMS1FwSU3OLAaJB5cWFOQXlSgEVxaXpObyMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjAyNDYyMTcyNzR0Nj4lQBAMqvL04</recordid><startdate>20211021</startdate><enddate>20211021</enddate><creator>Hildebrand, Ginger Vinyard</creator><creator>Coffman, Chunling Gu</creator><creator>Isangulov, Rustam</creator><scope>EVB</scope></search><sort><creationdate>20211021</creationdate><title>Well Construction Management and Decision Support System</title><author>Hildebrand, Ginger Vinyard ; Coffman, Chunling Gu ; Isangulov, Rustam</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2021324727A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2021</creationdate><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MINING</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><toplevel>online_resources</toplevel><creatorcontrib>Hildebrand, Ginger Vinyard</creatorcontrib><creatorcontrib>Coffman, Chunling Gu</creatorcontrib><creatorcontrib>Isangulov, Rustam</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hildebrand, Ginger Vinyard</au><au>Coffman, Chunling Gu</au><au>Isangulov, Rustam</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Well Construction Management and Decision Support System</title><date>2021-10-21</date><risdate>2021</risdate><abstract>A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a predetermined value of the well state parameter is determined. When the difference exceeds a selected threshold a modified well plan is calculated comprising at least one drilling task to enable construction of at least part of the wellbore to conform to the modified well plan. The at least one drilling task is displayed to a user.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2021324727A1 |
source | esp@cenet |
subjects | CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS FUNCTIONAL ELEMENTS OF SUCH SYSTEMS MINING MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS PHYSICS REGULATING |
title | Well Construction Management and Decision Support System |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T05%3A25%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Hildebrand,%20Ginger%20Vinyard&rft.date=2021-10-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2021324727A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |