Well Construction Management and Decision Support System

A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a pre...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Hildebrand, Ginger Vinyard, Coffman, Chunling Gu, Isangulov, Rustam
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method for wellbore construction management includes measuring at least one drilling operating parameter during drilling of a wellbore. At least one well state parameter is calculated from the measured drilling operating parameter. A difference between the calculated well state parameter and a predetermined value of the well state parameter is determined. When the difference exceeds a selected threshold a modified well plan is calculated comprising at least one drilling task to enable construction of at least part of the wellbore to conform to the modified well plan. The at least one drilling task is displayed to a user.