METHOD AND SYSTEM FOR INTEGRATED WELL CONSTRUCTION
A method may include obtaining, by the computer processor, rig operation data regarding various drilling rigs at different geographic locations. The method may further include generating, using the rig operation data, a model that identifies a level of risk associated with various rig operations. Th...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method may include obtaining, by the computer processor, rig operation data regarding various drilling rigs at different geographic locations. The method may further include generating, using the rig operation data, a model that identifies a level of risk associated with various rig operations. The method may further include simulating, by the computer processor and using the geographic location data and the model, a sequence of rig operations for constructing a portion of a wellbore drilled by a drilling rig at the desired geographic location. |
---|