METHOD FOR CONSTRUCTING NATURAL GAS LIQUEFACTION PLANT
Provided is a method of constructing a natural gas liquefaction plant, which can shorten a construction time period by minimizing effect of a lead time for the refrigerant compressor thereon, the method including: transporting a refrigerant compression module body 175 to an installation area 85, whe...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Provided is a method of constructing a natural gas liquefaction plant, which can shorten a construction time period by minimizing effect of a lead time for the refrigerant compressor thereon, the method including: transporting a refrigerant compression module body 175 to an installation area 85, wherein the refrigerant compression module body is provided with a frame 120 configured to allow refrigerant compressor 150 for compressing a refrigerant for cooling natural gas to be mounted therein; installing the refrigerant compression module body 175 to the installation area 85; and mounting the refrigerant compressor 150 into a mounting space 130 predefined in the frame 120 of the installed refrigerant compression module body. |
---|