RESOURCE CONSUMING TASKS SCHEDULER
In one implementation, a system for resource consuming tasks scheduling includes a metrics engine to identify a plurality of metrics based on a task to be scheduled, a utilization engine to generate a compiled representation of combined resource values over a period of time, wherein the combined res...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In one implementation, a system for resource consuming tasks scheduling includes a metrics engine to identify a plurality of metrics based on a task to be scheduled, a utilization engine to generate a compiled representation of combined resource values over a period of time, wherein the combined resource values are based on a combination of the plurality of metrics;, an identification engine to identify common lows of resource utilization for the plurality of metrics based on the generated representation, and a schedule engine to schedule the task for a time that corresponds to the identified common lows of resource utilization. |
---|