BUILD-UP STRATEGY FOR A CROWN BASE OF A TURBINE BLADE, AND TURBINE BLADE
Applying material along parallel welding lines per welding layer, and by changing direction of extension of the welding tracks by 90° for the next welding layer, provided.
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Applying material along parallel welding lines per welding layer, and by changing direction of extension of the welding tracks by 90° for the next welding layer, provided. |
---|