EVALUATION OF PROPOSED ENTERPRISE PLAN
A system includes identification of a first plurality of variables of a plan, the plan comprising budgeted values for the first plurality of variables and for a second plurality of other variables of the plan, and, for each of the first plurality of variables, determination of a first correlation wi...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A system includes identification of a first plurality of variables of a plan, the plan comprising budgeted values for the first plurality of variables and for a second plurality of other variables of the plan, and, for each of the first plurality of variables, determination of a first correlation with each of the second plurality of other variables of the plan based on historical values of the first plurality of variables and of the second plurality of variables, determination of a second correlation with each of the second plurality of other variables based on the budgeted values of the first plurality of variables and the second plurality of variables, and comparison of the first correlations with respective ones of the second correlations. A visualization is generated to illustrate one or more of the correlation comparisons. |
---|