Systems and Methods for Dynamic Islanding to Minimize Load Shed During Restoration After a Fault

A system and method for minimizing load shed during restoration after a fault in a power distribution network includes collecting customer prioritization data for a set of customers and calculating an inconvenience factor from the customer prioritization data on each customer in the set of customers...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LOSEE MARC KARL, ARVIND KAMAL KUMAR, MEADOWS VERNON
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A system and method for minimizing load shed during restoration after a fault in a power distribution network includes collecting customer prioritization data for a set of customers and calculating an inconvenience factor from the customer prioritization data on each customer in the set of customers. A load reduction required for restoration is determined, and at least one zone to be isolated from the power distribution network based the load reduction and the inconvenience factor is identified. The identified zone may then be isolated from the distribution network. The customer prioritization data may include customer priority data, customer load data, customer back-up device data, customer available back-up time, data related to willingness of customer to use their back-up device.