PREREQUISITE-DRIVEN MEETING SCHEDULING
A method, system and computer program product for prerequisite-driven meeting scheduling are provided. The method includes defining prerequisites to be met prior to confirming scheduling of a meeting, and defining a threshold to confirm scheduling of the meeting based on prerequisites completed. The...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method, system and computer program product for prerequisite-driven meeting scheduling are provided. The method includes defining prerequisites to be met prior to confirming scheduling of a meeting, and defining a threshold to confirm scheduling of the meeting based on prerequisites completed. The method also includes tracking the prerequisites completed prior to the meeting, the tracking performed by tracking logic of a scheduling tool executing on a host system. The method further includes confirming that the meeting will be held as scheduled in response to determining that the prerequisites completed meet the threshold. The method additionally includes rescheduling the meeting in response to determining that the prerequisites completed are below the threshold, the rescheduling performed by the scheduling tool executing on the host system. |
---|