SOFT START OF A SWITCHED SECONDARY CONTROL CIRCUIT FOR A SWITCHED MODE POWER SUPPLY
Usually when switched secondary control is used to regulate output voltages in a flyback converter, high peak currents through the secondary switch occur during startup. Traditional soft-start methods cannot be applied to limit these peak currents. With the inventive control circuit and method, curr...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Usually when switched secondary control is used to regulate output voltages in a flyback converter, high peak currents through the secondary switch occur during startup. Traditional soft-start methods cannot be applied to limit these peak currents. With the inventive control circuit and method, current limiting during startup is achieved by measuring the magnetic flux in the fly-back transformer, and by advancing the time instant at which current flow through the secondary switch (11) starts with respect to the end of the flyback stroke in dependence of the magnetic flux in the transformer. |
---|