Thermal recovery construction method
A thermal recovery construction method includes the steps of determining design parameters of a current thermal recovery construction according to geological data and reservoir characteristics of a current oil deposit area to be stimulated; preparing, according to the design parameters, coal water s...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A thermal recovery construction method includes the steps of determining design parameters of a current thermal recovery construction according to geological data and reservoir characteristics of a current oil deposit area to be stimulated; preparing, according to the design parameters, coal water slurry required for the current thermal recovery construction; injecting the coal water slurry into a target reservoir through an injection well with an injection mode of the design parameters, along with combustion adjuvant with an amount selected based on a total injection amount of the coal water slurry; and inducing spontaneous combustion of the coal water slurry by thermal energy generated by a downhole heating device, and performing control and displacement on the reservoir with the thermal energy and gas generated after the combustion. |
---|