Integrated comprehensive adjustment method for pulverized coal boiler based on prevention and control of high-temperature corrosion of water wall

An integrated comprehensive adjustment method for a pulverized coal boiler based on high-temperature corrosion prevention and control of water wall is provided. The method includes: during shutdown period of the boiler, mounting reducing atmosphere sampling pipe on a water-cooled wall region; carryi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Peng, Xiaomin, Zhao, Peng, Ding, Yiwen, Chen, Baokang, Mei, Zhenfeng, Chen, Min, Yu, Shengjie, Liu, Ruipeng, Wang, Xiaohua, Xue, Xiaolei, Zhu, Jinyong, Li, Yue
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An integrated comprehensive adjustment method for a pulverized coal boiler based on high-temperature corrosion prevention and control of water wall is provided. The method includes: during shutdown period of the boiler, mounting reducing atmosphere sampling pipe on a water-cooled wall region; carrying out a diagnostic test on the boiler; carrying out an optimization and adjustment test of a boiler pulverizing system; carrying out a single-factor adjustment test of boiler-related parameters; determining degrees of influence of different parameters on water wall reducing atmosphere, thermal efficiency of the boiler and NOx concentration at a denitration inlet; carrying out an optimization test of ammonia spraying of a denitration system; carrying out a maximum safe denitration efficiency test; and finding a balance point among the water wall reducing atmosphere, the thermal efficiency of the boiler and the NOx concentration at the denitration inlet.