Orchestration framework to determine composite well construction recommendations
The disclosure presents processes to determine one or more recommendations to well construction operations, generated by analyzing impacts on well construction operations. The impacts can include impacts to the drilling assembly, impacts of the subterranean formation characteristics, impacts on cost...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The disclosure presents processes to determine one or more recommendations to well construction operations, generated by analyzing impacts on well construction operations. The impacts can include impacts to the drilling assembly, impacts of the subterranean formation characteristics, impacts on cost, time and performance of the well construction operation, impacts on the service quality, impacts to system integrity, impacts to surface equipment, as well as other impact types, such as geological surveys, seismic surveys, stratigraphic analysis, or reservoir estimations. Each impact can be analyzed using an impact parameter and a softness parameter. An impact map can be computed for each of the parameters, and then the impact maps can be combined to compute one or more integrated impact maps from which the recommendations can be determined. The recommendations can be communicated to a well construction system, such as a geo-steering system, a user system, a well site controller, or other systems. |
---|