True zero RTO: planned failover
One example method includes performing, as part a planned failover procedure, operations that include connecting a replica OS disk to a replica VM, powering up the replica VM, booting an OS of the replica VM, disconnecting a source VM from a network, and connecting replica data disks to the replica...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!