True zero RTO: planned failover

One example method includes performing, as part a planned failover procedure, operations that include connecting a replica OS disk to a replica VM, powering up the replica VM, booting an OS of the replica VM, disconnecting a source VM from a network, and connecting replica data disks to the replica...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Wolfson, Kfir, Shemer, Jehuda, Said, Jawad
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!