True zero RTO: planned failover
One example method includes performing, as part a planned failover procedure, operations that include connecting a replica OS disk to a replica VM, powering up the replica VM, booting an OS of the replica VM, disconnecting a source VM from a network, and connecting replica data disks to the replica...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | One example method includes performing, as part a planned failover procedure, operations that include connecting a replica OS disk to a replica VM, powering up the replica VM, booting an OS of the replica VM, disconnecting a source VM from a network, and connecting replica data disks to the replica VM. IOs issued by an application at the source VM continue to be processed by the source VM while the replica OS disk is connected, the replica VM is powered up, and the OS of the replica VM is booted. |
---|