Predicting formation breakdown pressure for hydrocarbon recovery applications
Systems and methods include a method for determining a breakdown pressure for the wellbore. Input parameters are received for computing a breakdown pressure for a wellbore. A pore pressure is determined using a Stehfest method equation using a function of a time duration, a distance from the wellbor...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Systems and methods include a method for determining a breakdown pressure for the wellbore. Input parameters are received for computing a breakdown pressure for a wellbore. A pore pressure is determined using a Stehfest method equation using a function of a time duration, a distance from the wellbore, an injection fluid compressibility, a Biot poroelastic parameter, and a modified Bessel function. A poroelastic stress is determined using a poroelastic stress equation based on the pore pressure determined for the wellbore, a Composite Simpson's Rule for numerical integration, an empirical parameter, a pore pressure, a Biot poroelastic parameter, tensile strength of rock, and a Poisson distribution. A breakdown pressure is determined using a tested time-based formula, poroelastic stress, a minimum and a maximum horizontal stress, using a formula tested against multiple wells and a distance from the wellbore in a radial direction. |
---|