Rapid construction method for secondary lining of small-section tunnel
A rapid construction method for a secondary lining of a small-section tunnel includes steps of: transporting and store secondary lining steel bars to a designated position in the tunnel with a steel bar transport vehicle and a wheel type dump truck; after the tunnel is cleaned, simultaneously constr...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A rapid construction method for a secondary lining of a small-section tunnel includes steps of: transporting and store secondary lining steel bars to a designated position in the tunnel with a steel bar transport vehicle and a wheel type dump truck; after the tunnel is cleaned, simultaneously constructing the secondary lining from two ends to a middle of the tunnel; constructing a lower inverted arch with a customized inverted arch formwork and then constructing an upper arch wall with a plurality of portal arch wall formwork trolleys; wherein the portal arch wall formwork trolleys form a set, and are connected by hinges, so as to construct in a curve tunnel. The rapid construction method has a long single construction section, and procedure connection is compact, thereby realizing rapid and efficient construction of the secondary lining. |
---|