Method and system for generating a completion design using a streamline model
Reservoir sweep efficiency includes obtaining fluid front arrival times for streamlines in a reservoir. A wellbore is partitioned into independent production zones, and a target flow rate is allocated to each of the independent production zones based on the fluid front arrival times. Partition choke...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Reservoir sweep efficiency includes obtaining fluid front arrival times for streamlines in a reservoir. A wellbore is partitioned into independent production zones, and a target flow rate is allocated to each of the independent production zones based on the fluid front arrival times. Partition choke parameters complying with the target flow rates are allocated to generate a completion design, which is presented. |
---|