Scheduler, substrate processing apparatus, and substrate conveyance method
A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length. |
---|