Scheduling workload service operations using value increase scheme
An example method includes receiving a nominal equivalent resource usage data, an infrastructure usage data, an effective production capacity, a demand elasticity curve, and workload scheduling constraints across a plurality of accounts. The method includes calculating an equivalent resource utiliza...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An example method includes receiving a nominal equivalent resource usage data, an infrastructure usage data, an effective production capacity, a demand elasticity curve, and workload scheduling constraints across a plurality of accounts. The method includes calculating an equivalent resource utilization based on the nominal equivalent resource usage data, the infrastructure usage data, and the effective production capacity. The method includes calculating a potential value increase for a service based on the workload scheduling constraints, the nominal equivalent resource usage data, the effective production capacity, and the demand elasticity curve. The method includes calculating a value increase scheme for the service based on the potential value increase and sending the value increase scheme to a user workload device. The method includes receiving a workload constraint from the user workload device and scheduling a workload service operation based on the infrastructure usage data, the value increase scheme, and the workload constraint. |
---|