Optimized smart meter reporting schedule
The invention relates to a method for determining, by a scheduler, at least one transmission parameter for each of a plurality of smart meters which each transmit, via power line communication, a measurement report to a control entity. The at least one transmission parameter allows a reporting time...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a method for determining, by a scheduler, at least one transmission parameter for each of a plurality of smart meters which each transmit, via power line communication, a measurement report to a control entity. The at least one transmission parameter allows a reporting time for a corresponding smart meter to be determined. The method comprises the following steps: At least one status parameter is collected for each of the plurality of smart meters, the at least one status parameter influencing a success rate of the transmission of the corresponding measurement report to the control entity. For each of the plurality of smart meters, the at least one transmission parameter allowing the reporting time for the corresponding smart meter to be determined, is determined based on the collected at least one status parameter. |
---|