Method, system, and medium of construction project management
A method of construction project management is disclosed. In one embodiment, parameters of a construction project design are provided to an asset at a construction site. Geospatial information is then collected by the asset while the asset is implementing parameters of the construction project desig...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method of construction project management is disclosed. In one embodiment, parameters of a construction project design are provided to an asset at a construction site. Geospatial information is then collected by the asset while the asset is implementing parameters of the construction project design at the construction site. The geospatial information is provided to a construction management computing system in real-time. The construction management computing system is remote from the asset. Progress on the construction site design is then dynamically updated in real-time by the construction management computing system based on the geospatial information to create a real-time, as constructed model of the construction project. |
---|