METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS
Method for working-out edge zone of iron-ore pits includes formation and slope formation of terraces, with drilling vertical explosion wells of slope formation with following explosion, extraction of detached rocks with open-pit mechanical shovel. In the process of slope formation along the designed...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SOKURENKO ANATOLII VALENTYNOVYCH SHEREMET VOLODYMYR OLEKSANDROVYCH BREKHUNOV OLEKSANDR VASYLOVYCH CHERKONOS VOLODYMYR FEDOROVYCH KEKUKH ANATOLII VOLODYMYROVYCH KOZENKO HEORHII VOLODMYROVYCH DRYZHENKO ANATOLII YURIIOVYCH DOMNICHEV VOLODYMYR MYKOLAIOVYCH TEMNII VIKTOR PETROVYCH |
description | Method for working-out edge zone of iron-ore pits includes formation and slope formation of terraces, with drilling vertical explosion wells of slope formation with following explosion, extraction of detached rocks with open-pit mechanical shovel. In the process of slope formation along the designed plane of the slope of terraces in the band of slot-formation one drills the last row of vertical contour wells at distance (m) from the upper edge of the intact massif, near the last row of contour wells in direction to worked-out space one forms rows of additional vertical wells in band with width (m). Distance and distance are determined by formulas. Decrease of labor consumption at rock extraction is achieved. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_UA76884C2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>UA76884C2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_UA76884C23</originalsourceid><addsrcrecordid>eNrjZDD0dQ3x8HdRcPMPUgj3D_L29HPX9Q8NUXB1cXdViPL3c1Xwd1PwDPL3U_APclUI8AwJ5mFgTUvMKU7lhdLcDHJuriHOHrqpBfnxqcUFicmpeakl8aGO5mYWFibORsYEFQAAYj4lOA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS</title><source>esp@cenet</source><creator>SOKURENKO ANATOLII VALENTYNOVYCH ; SHEREMET VOLODYMYR OLEKSANDROVYCH ; BREKHUNOV OLEKSANDR VASYLOVYCH ; CHERKONOS VOLODYMYR FEDOROVYCH ; KEKUKH ANATOLII VOLODYMYROVYCH ; KOZENKO HEORHII VOLODMYROVYCH ; DRYZHENKO ANATOLII YURIIOVYCH ; DOMNICHEV VOLODYMYR MYKOLAIOVYCH ; TEMNII VIKTOR PETROVYCH</creator><creatorcontrib>SOKURENKO ANATOLII VALENTYNOVYCH ; SHEREMET VOLODYMYR OLEKSANDROVYCH ; BREKHUNOV OLEKSANDR VASYLOVYCH ; CHERKONOS VOLODYMYR FEDOROVYCH ; KEKUKH ANATOLII VOLODYMYROVYCH ; KOZENKO HEORHII VOLODMYROVYCH ; DRYZHENKO ANATOLII YURIIOVYCH ; DOMNICHEV VOLODYMYR MYKOLAIOVYCH ; TEMNII VIKTOR PETROVYCH</creatorcontrib><description>Method for working-out edge zone of iron-ore pits includes formation and slope formation of terraces, with drilling vertical explosion wells of slope formation with following explosion, extraction of detached rocks with open-pit mechanical shovel. In the process of slope formation along the designed plane of the slope of terraces in the band of slot-formation one drills the last row of vertical contour wells at distance (m) from the upper edge of the intact massif, near the last row of contour wells in direction to worked-out space one forms rows of additional vertical wells in band with width (m). Distance and distance are determined by formulas. Decrease of labor consumption at rock extraction is achieved.</description><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; MINING OR QUARRYING</subject><creationdate>2006</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20060915&DB=EPODOC&CC=UA&NR=76884C2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20060915&DB=EPODOC&CC=UA&NR=76884C2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SOKURENKO ANATOLII VALENTYNOVYCH</creatorcontrib><creatorcontrib>SHEREMET VOLODYMYR OLEKSANDROVYCH</creatorcontrib><creatorcontrib>BREKHUNOV OLEKSANDR VASYLOVYCH</creatorcontrib><creatorcontrib>CHERKONOS VOLODYMYR FEDOROVYCH</creatorcontrib><creatorcontrib>KEKUKH ANATOLII VOLODYMYROVYCH</creatorcontrib><creatorcontrib>KOZENKO HEORHII VOLODMYROVYCH</creatorcontrib><creatorcontrib>DRYZHENKO ANATOLII YURIIOVYCH</creatorcontrib><creatorcontrib>DOMNICHEV VOLODYMYR MYKOLAIOVYCH</creatorcontrib><creatorcontrib>TEMNII VIKTOR PETROVYCH</creatorcontrib><title>METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS</title><description>Method for working-out edge zone of iron-ore pits includes formation and slope formation of terraces, with drilling vertical explosion wells of slope formation with following explosion, extraction of detached rocks with open-pit mechanical shovel. In the process of slope formation along the designed plane of the slope of terraces in the band of slot-formation one drills the last row of vertical contour wells at distance (m) from the upper edge of the intact massif, near the last row of contour wells in direction to worked-out space one forms rows of additional vertical wells in band with width (m). Distance and distance are determined by formulas. Decrease of labor consumption at rock extraction is achieved.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2006</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD0dQ3x8HdRcPMPUgj3D_L29HPX9Q8NUXB1cXdViPL3c1Xwd1PwDPL3U_APclUI8AwJ5mFgTUvMKU7lhdLcDHJuriHOHrqpBfnxqcUFicmpeakl8aGO5mYWFibORsYEFQAAYj4lOA</recordid><startdate>20060915</startdate><enddate>20060915</enddate><creator>SOKURENKO ANATOLII VALENTYNOVYCH</creator><creator>SHEREMET VOLODYMYR OLEKSANDROVYCH</creator><creator>BREKHUNOV OLEKSANDR VASYLOVYCH</creator><creator>CHERKONOS VOLODYMYR FEDOROVYCH</creator><creator>KEKUKH ANATOLII VOLODYMYROVYCH</creator><creator>KOZENKO HEORHII VOLODMYROVYCH</creator><creator>DRYZHENKO ANATOLII YURIIOVYCH</creator><creator>DOMNICHEV VOLODYMYR MYKOLAIOVYCH</creator><creator>TEMNII VIKTOR PETROVYCH</creator><scope>EVB</scope></search><sort><creationdate>20060915</creationdate><title>METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS</title><author>SOKURENKO ANATOLII VALENTYNOVYCH ; SHEREMET VOLODYMYR OLEKSANDROVYCH ; BREKHUNOV OLEKSANDR VASYLOVYCH ; CHERKONOS VOLODYMYR FEDOROVYCH ; KEKUKH ANATOLII VOLODYMYROVYCH ; KOZENKO HEORHII VOLODMYROVYCH ; DRYZHENKO ANATOLII YURIIOVYCH ; DOMNICHEV VOLODYMYR MYKOLAIOVYCH ; TEMNII VIKTOR PETROVYCH</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_UA76884C23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2006</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><toplevel>online_resources</toplevel><creatorcontrib>SOKURENKO ANATOLII VALENTYNOVYCH</creatorcontrib><creatorcontrib>SHEREMET VOLODYMYR OLEKSANDROVYCH</creatorcontrib><creatorcontrib>BREKHUNOV OLEKSANDR VASYLOVYCH</creatorcontrib><creatorcontrib>CHERKONOS VOLODYMYR FEDOROVYCH</creatorcontrib><creatorcontrib>KEKUKH ANATOLII VOLODYMYROVYCH</creatorcontrib><creatorcontrib>KOZENKO HEORHII VOLODMYROVYCH</creatorcontrib><creatorcontrib>DRYZHENKO ANATOLII YURIIOVYCH</creatorcontrib><creatorcontrib>DOMNICHEV VOLODYMYR MYKOLAIOVYCH</creatorcontrib><creatorcontrib>TEMNII VIKTOR PETROVYCH</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SOKURENKO ANATOLII VALENTYNOVYCH</au><au>SHEREMET VOLODYMYR OLEKSANDROVYCH</au><au>BREKHUNOV OLEKSANDR VASYLOVYCH</au><au>CHERKONOS VOLODYMYR FEDOROVYCH</au><au>KEKUKH ANATOLII VOLODYMYROVYCH</au><au>KOZENKO HEORHII VOLODMYROVYCH</au><au>DRYZHENKO ANATOLII YURIIOVYCH</au><au>DOMNICHEV VOLODYMYR MYKOLAIOVYCH</au><au>TEMNII VIKTOR PETROVYCH</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS</title><date>2006-09-15</date><risdate>2006</risdate><abstract>Method for working-out edge zone of iron-ore pits includes formation and slope formation of terraces, with drilling vertical explosion wells of slope formation with following explosion, extraction of detached rocks with open-pit mechanical shovel. In the process of slope formation along the designed plane of the slope of terraces in the band of slot-formation one drills the last row of vertical contour wells at distance (m) from the upper edge of the intact massif, near the last row of contour wells in direction to worked-out space one forms rows of additional vertical wells in band with width (m). Distance and distance are determined by formulas. Decrease of labor consumption at rock extraction is achieved.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_UA76884C2 |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS MINING MINING OR QUARRYING |
title | METHOD FOR WORKING-OUT EDGE ZONE OF IRON ORE PITS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T14%3A53%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SOKURENKO%20ANATOLII%20VALENTYNOVYCH&rft.date=2006-09-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUA76884C2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |