METHOD FOR INCREASING STABILITY OF PREPARATION WORKING
Method to increase stability of preparation working includes formation of a truss in the side wall of the working at the side of the coal massif, yielding barrier, working-out of the faces. Before working out the faces one forms a yielding barrier at the side of the massif and at the side of the fac...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Method to increase stability of preparation working includes formation of a truss in the side wall of the working at the side of the coal massif, yielding barrier, working-out of the faces. Before working out the faces one forms a yielding barrier at the side of the massif and at the side of the face through explosion of camouflet charges outside the zone of the support rock pressure, and after working out the face the truss is filled with the risen rocks of the base of the working that are risen; then one works out the next face. |
---|