A METHOD OF RECLAMATION OF LAND DISTURBED BY OPEN PIT MINING
The method of land reclamation includes laying potentially fertile rocks and black soil on the disturbed surface. On the planned surface, trenches are cut with a rotary excavator and backfilled with non-phytotoxic bedrock 8-56 cm thick with the addition of phosphogypsum. The top layer, taking into a...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; ukr |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The method of land reclamation includes laying potentially fertile rocks and black soil on the disturbed surface. On the planned surface, trenches are cut with a rotary excavator and backfilled with non-phytotoxic bedrock 8-56 cm thick with the addition of phosphogypsum. The top layer, taking into account shrinkage, is 8-16 cm and is represented by a selectively developed humus-eluvial horizon of zonal soil.
Спосіб рекультивації земель включає укладання на порушену поверхню потенційно-родючих порід та чорнозему. На спланованій поверхні роторним екскаватором нарізають траншеї і здійснюють їх засипку нефітотоксичною материнською породою товщиною 8-56 см з додаванням фосфогіпсу. Верхній шар, з урахуванням усадки, становить 8-16 см і представлений селективно розробленим гумусово-елювіальним горизонтом зонального ґрунту. |
---|