COMBINED METHOD OF DELIVERY OF ORE AT UNDERGROUND MINING OF STEEPLY DIPPING POWERFUL ORE DEPOSITS
The combined method of delivery of ore at underground mining of steeply dipping powerful ore deposits includes a partition of the ore body at its strike to the individual blocks within the height of the floor, the performance of preparatory workings with division of each height unit on sub-stages an...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus ; ukr |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The combined method of delivery of ore at underground mining of steeply dipping powerful ore deposits includes a partition of the ore body at its strike to the individual blocks within the height of the floor, the performance of preparatory workings with division of each height unit on sub-stages and, along strike for several sewage panels, of about the same size, with their alternate working off, starting from the top, through threaded openings at each sub-stage, a drilling with deep wells and the mass collapse of ore in sewage panels. The load-delivery cross cuts that run along the contours of the sewage panel, and drifts of scraping are interconnected with ore passes. Initial delivery of the ore is then carried out on all drifts of scraping simultaneously, from the center to both sides of the sewage panel by multi-bucket scraper installations from each pair of exhaust openings. The number of scrapers of scraper installation corresponds to the number of pairs of outlets, from which the release is carried out. The volumes of scrapers, while starting from the tail, are twice exceeding the previous amount. Unloading is carried out in the ore passes, from which with the help of the dosing means they are transferred into the bucket of self-moving load-delivery machines and by load-delivery cross cuts it is moved to the unloading place directly in vehicles or in major ore pass.
Комбинированный способ доставки рудной массы при подземной разработке крутопадающих мощных рудных залежей включает разбиение в пределах высоты этажа рудного тела по его простиранию на отдельные блоки, проведение подготовительных выработок с разделением каждого блока по высоте, на подэтажи и, по простиранию на несколько очистных панелей, примерно одинаковых размеров, с поочередной их отработкой, начиная с верхней, путем проведения на каждом подэтаже нарезных выработок, разбуривания массива глубокими скважинами и массового обрушения руды в очистных панелях. Погрузочно-доставочные орты, которые проходят по контурам очистной панели, и штреки скреперования соединяются между собой рудоспусками. Первичная доставка руды, при этом осуществляется по всем штреках скреперования одновременно, от центра в обе стороны очистной панели, многоковшевыми скреперными установками от каждой пары выпускных выработок. Количество скреперов скреперной установки соответствует числу пар выпускных отверстий, из которых проводят выпуск. Объемы скреперов, при этом, начиная с хвостового, в два раза превышают объем пред |
---|