Scheduling method for coke furnaces
A scheduling method for coke furnaces is provided. The adjustment method includes a preparation step, a push step, and an adjustment step. A deviation time is calculated by calculating an operating time and an estimated pushing time of the abnormal coke furnace, and an adjusted pushing time of the a...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A scheduling method for coke furnaces is provided. The adjustment method includes a preparation step, a push step, and an adjustment step. A deviation time is calculated by calculating an operating time and an estimated pushing time of the abnormal coke furnace, and an adjusted pushing time of the abnormal coke furnace is obtained according to the deviation time, so as to avoid empty burning of multiple coke furnaces. |
---|