Geotextile bridge foundation protection method
A geotextile bridge foundation protection method, which comprises: an annular recess is formed by excavating around cap of bridge pier, level of bottom surface of recess is lower than level of top of cap; applying geotextile and covering side of cap, upper edge of geotextile covering at least edge o...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A geotextile bridge foundation protection method, which comprises: an annular recess is formed by excavating around cap of bridge pier, level of bottom surface of recess is lower than level of top of cap; applying geotextile and covering side of cap, upper edge of geotextile covering at least edge of top of cap, lower edge of geotextile covering part or all of bottom surface of recess; applying protection layer on top of geotextile; and, applying a plurality of tribar armors into recess and suppressing top of protection layer and geotextile. |
---|