Geotextile bridge foundation protection method

A geotextile bridge foundation protection method, which comprises: an annular recess is formed by excavating around cap of bridge pier, level of bottom surface of recess is lower than level of top of cap; applying geotextile and covering side of cap, upper edge of geotextile covering at least edge o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LAI, JUI-YING, LIN, YA-WEN, TSENG, WENIEH, TSAI, LI-HUNG, HU, CHI-WEN, KO, JENG-LONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A geotextile bridge foundation protection method, which comprises: an annular recess is formed by excavating around cap of bridge pier, level of bottom surface of recess is lower than level of top of cap; applying geotextile and covering side of cap, upper edge of geotextile covering at least edge of top of cap, lower edge of geotextile covering part or all of bottom surface of recess; applying protection layer on top of geotextile; and, applying a plurality of tribar armors into recess and suppressing top of protection layer and geotextile.