TRAIN CONTROL SYSTEM

A train control system according to an embodiment includes an acquisition part, a prediction part, and a controller. The acquisition part acquires actual first-station arrival times or first-station departure times of a second train preceding a first train being a control target and at least one or...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NAMEKI Hideaki, TAJIMA Masahiro
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A train control system according to an embodiment includes an acquisition part, a prediction part, and a controller. The acquisition part acquires actual first-station arrival times or first-station departure times of a second train preceding a first train being a control target and at least one or more third trains among a plurality of trains preceding the second train. The prediction part predicts a first time at which a stopping signal received by the first train in front of a first station due to influences of the second and third trains is canceled based on the actual first-station arrival times or first-station departure times of the second and third trains. The controller controls an operation of the first train based on the first time.