Method for advancing an underground chamber, for example a tunnel

Construction of an underground chamber, for example a tunnel, involves drilling, blasting and cutting. For each newly blasted section, a calculation is made, immediately after blasting, to determine the total number of reinforcements needed for the section in question. These reinforcements are then...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: OE SJOESTROEM
Format: Patent
Sprache:eng ; swe
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Construction of an underground chamber, for example a tunnel, involves drilling, blasting and cutting. For each newly blasted section, a calculation is made, immediately after blasting, to determine the total number of reinforcements needed for the section in question. These reinforcements are then integrated in the normal advance cycle. This prevents the development of unnecessary deformations and at the same time permits improved safety and greater rationalization of the work.