A system for operational control of the train operation of a railroad section based on the determination of its throughput capacity

FIELD: train operation control.SUBSTANCE: invention relates to the means of controlling train operation of a railroad section based on determining its throughput capacity. The system contains a traffic service employe's workstation, including Unit 6 for entry of the parameters of a standard tra...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Dovgerd Gleb Aleksandrovich, Rozenberg Efim Naumovich, Mironov Vladimir Sergeevich, Olshanskij Aleksej Mikhajlovich, Lysikov Mikhail Grigorevich
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: train operation control.SUBSTANCE: invention relates to the means of controlling train operation of a railroad section based on determining its throughput capacity. The system contains a traffic service employe's workstation, including Unit 6 for entry of the parameters of a standard train schedule, Unit 7 for calculating infrastructure parameters, Unit 8 for setting train traffic conditions, Unit 9 for calculating the available throughput capacity, Unit 10 for calculating the required throughput, Unit 11 for comparing the calculations, Unit 12 for making comparisons with the set values, Computer 1 of the workstation of the traffic service employee, including Processor 2, with the first memory bank of Unit 3, Unit 4 for information entry connected to it and a monitor; data processing Unit 14, including Server 13, memory Unit 15 with a database of the infrastructure digital model, Unit 16 for generating reference information (RI), memory Unit 17 with a database of reference information, Unit 18 for generating a simulation model, with elements of artificial intelligence, Unit 19 for verification with the learning function, Unit 20 for integrating the model into the decision-making support system, Unit 21 for generating train handling options, software and hardware Ulock 22 for simulation and testing quantum computations, signal data converters 23 and 24, Unit 25 for generating a model described in quantum form, and Unit 26 for generating a model with a learning function.EFFECT: increased efficiency of train operation management.1 cl, 1 dwg Изобретение относится к средствам управления поездной работой участка железной дороги на основе определения его пропускной способности. Система содержит АРМ работника службы движения, включающий блок 6 ввода параметров нормативного графика движения поездов, блок 7 вычисления параметров инфраструктуры, блок 8 задания условий движения поездов, блок 9 вычисления наличной пропускной способности, блок 10 вычисления потребной пропускной способности, блок 11 сравнения вычислений, блок 12 сравнения с установленным значением, компьютер 1 АРМ работника службы движения, включающий процессор 2, с подключенными к нему первым блоком 3 памяти, блоком 4 ввода информации и монитором; центр 14 обработки данных, включающий сервер 13, блок 15 памяти с базой данных цифровой модели инфраструктуры, блок 16 генерации нормативно-справочной информации (НСИ), блок 17 памяти с базой данных нормативно-справочной информации, блок 18 формирования