METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF CEMETRY

FIELD: construction.SUBSTANCE: method involves separate excavation, removal and storage in separate tape piles of topsoil and overburden, development of career fields, filling of exhausted space to the boundary of the upper level of ground water with construction waste, similar by composition to nat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Morozova Valentina Vitalevna, Popov Sergej Nikolaevich, Boldyrev Oleg Valentinovich, Mukhortova Tatyana Leonidovna, Mukhortov Vasilij Vasilevich
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: construction.SUBSTANCE: method involves separate excavation, removal and storage in separate tape piles of topsoil and overburden, development of career fields, filling of exhausted space to the boundary of the upper level of ground water with construction waste, similar by composition to natural minerals with various grain size fractions, layered with followed consolidation of each layer, laying of drainage layer of building waste, with the grain size fraction 150-200 mm. Above the drainage layer an intermediate layer is backfilled with construction waste with the grain size fractions less than 120 mm. Backfilling is performed until the moment when the upper boundary of the intermediate layer reaches 1/2 of the height of exhausted space of the pit. Then, above the intermediate layer the initial backfilling of exhausted space of the pit with the mix consisting of waste rock, clay and crushed building waste with the grain fraction sizes less than 100 mm mixed in equal proportions. Moreover backfill is performed layer by layer with the thickness of each successive layer no more than 1 meter with compaction of each layer. This operation is performed before complete filling of exhausted space of the pit. Along the surface graded by bulldozer the surface of exhausted space of the pit is backfilled with the mix of sand and gravel, fraction 5, mixed in equal proportions with the minimum layer thickness 100 mm.EFFECT: decrease of labour cost of recovery works, as well as soil protection from wind and water erosion. Изобретение относится к технической рекультивации карьерных выемок, остающихся после добычи строительного камня и других приповерхностных полезных ископаемых. Техническим результатом является снижение трудозатрат восстановительных работ, а также защита почвы от ветровой и водной эрозии. Способ включает раздельную выемку, перемещение и складирование в отдельные ленточные отвалы почвенного слоя и вскрышных пород, выработку карьерного поля, закладку выработанного пространства до границы верхнего уровня грунтовых вод строительными отходами, близкими по своему составу к природным минералам с различной крупностью фракций, послойно с последующим уплотнением каждого слоя, укладку дренирующего слоя строительными отходами, с крупностью фракций 150-200 мм. Поверх дренирующего слоя отсыпают промежуточный слой строительными отходами с крупностью фракций не более 120 мм. Отсыпку производят до того момента, пока верхняя граница промежуточного слоя не достигнет