METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS

FIELD: oil and gas industry.SUBSTANCE: invention finds application in water shutoff in a horizontal or inclined sections of trunks wells. Method of isolation of inflow of water in the open horizontal section of the production well involves extraction from wells pumping equipment, the descent of the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZIJATDINOV RADIK ZJAUZJATOVICH, MANSUROV AJDAR ULFATOVICH, KADYROV RAMZIS RAKHIMOVICH, MAKHMUTOV ILGIZAR KHASIMOVICH
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: oil and gas industry.SUBSTANCE: invention finds application in water shutoff in a horizontal or inclined sections of trunks wells. Method of isolation of inflow of water in the open horizontal section of the production well involves extraction from wells pumping equipment, the descent of the pipe string in the well, injecting through them waterproofing solution hardening properties, the creation of an impermeable screen range water-revealing formation and subsequent leaching of waterproofing solution from wells by reverse circulation after initial setting waterproofing compound. After removal from the production well pumping equipment is carried out geophysical survey and determine water-revealing formation interval length in the horizontal section of open hole wellbore. Then openhole horizontal section of the wellbore tubular string is lowered further, the guide funnel fitted on top and the sealing packer. Following additional sealing packer pipe string is equipped with two water-swellable packers length of 1 m each, interconnected by a perforated pipe length equal to the length of the interval water-revealing formation. Inside the tubing for additional perforated pipe installed retainer. Thus after further lowering the pipe string into the open horizontal section of the wellbore and landing sealing packer swellable packers are placed on the interval boundaries water-revealing formation. After waiting swelling packer pipe string lowered into the wellbore. Waterproofing solution is pumped along the pipe string through the holes in the pipe perforation interval water-revealing formation to form a waterproofing screen. After that the injection of the washing liquid with the creation of reverse circulation waterproofing eluted solution from the pipe string more wells. Produce more perforations of the pipe string before and after the interval boundaries water-revealing formation. Then, in the well at the end of the pipe string lowered hydraulic disconnector expandable sleeve and a check valve that passes from the bottom to the wellhead. This expandable sleeve at the ends equipped with sealing rings. Launching process pipe string into the well to carry out the interaction with the expandable sleeve retainer. After that, the process pipe string is pressurized and produce outward radial expansion of the sleeve to seal the end seals further perforated pipe tubing string. Then disconnect the hydraulic isolator produce expandable sleeve by the extraction proc