METHOD OF WATER-PRODUCING WELL RECOVERY

FIELD: oil and gas industry.SUBSTANCE: invention is related to the oil and gas industry, and namely to the recovery of a water-producing well and in particular to the recovery of the water-producing well, which upper part is placed in a low-temperature clogged-up terrigenous reservoir close to perma...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KANASHOV VLADIMIR PETROVICH, KUSTYSHEV ALEKSANDR VASIL'EVICH, KRJAKVIN DMITRIJ ALEKSANDROVICH, KUSTYSHEV DENIS ALEKSANDROVICH, SARANCHIN MAKSIM VLADIMIROVICH, SKRYLEV SERGEJ ALEKSANDROVICH, ISAKOVA OL'GA VLADIMIROVNA
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: oil and gas industry.SUBSTANCE: invention is related to the oil and gas industry, and namely to the recovery of a water-producing well and in particular to the recovery of the water-producing well, which upper part is placed in a low-temperature clogged-up terrigenous reservoir close to permafrost rock. According to the method the lower water-producing part of the production string is liquidated. To this end a tubing string is withdrawn from the well. A permanent cement plug is set in the flow string. The upper unflooded part of the production string is perforated within the interval of low-permeable low-temperature terrigenous deposits located lower than the permafrost rock. The flow string is run down to the perforation interval. Acetone is injected in sequence in the volume of 1-2 mto the bottomhole zone of the low-temperature and low-permeable clogged-up terrigenous deposits per 1 m of the perforated thickness. Then aerated and dispersed aqueous solution of hydrogen peroxide is injected with concentration of less than 10-15 wt % in volume of 2-3 mper 1m of the perforated thickness. The aerated and dispersed aqueous solution of hydrogen peroxide is flushed to the low-temperature and low-permeable clogged-up terrigenous deposits by gas condensate with short-time withhold in production for the period of clay components peeling off from rock particles. A mixture consisting of the gas condensate, an aerated and dispersed aqueous solution of hydrogen peroxide and acetone with peeled off clay components of the rock are removed and extracted from the borehole. Then the borehole is developed by the delivery of an inert gas, for example, nitrogen, to it. The well is cleaned up and introduced into operation by makeup of the pre-set tuning string.EFFECT: increased efficiency in the recovery of the water-producing well due to thereturn of its upper part into operation.3 ex, 5 dwg Изобретение относится к нефтегазодобывающей промышленности, а именно к восстановлению обводненной скважины и, в частности, к восстановлению обводненной скважины, верхняя часть которой расположена в заглинизированном низкотемпературном терригенном коллекторе вблизи многолетнемерзлых пород. Технический результат - повышение эффективности восстановления обводненной скважины за счет приобщения к эксплуатации верхней ее части.По способу ликвидируют нижнюю обводнившуюся часть эксплуатационной колонны. Для этого извлекают из скважины лифтовую колонну. В эксплуатационной колонне устанавлива