INFORMATION-MEASURING AND CONTROL SYSTEM OF OPTIMISATION OF PRODUCTION AND CONSUMPTION OF HEAT ENERGY AT DISTRIBUTED FACILITIES OF HEAT SUPPLY
FIELD: heating.SUBSTANCE: essence of information-measuring and control system of optimisation of production and consumption of heat energy at the distributed facilities of heat supply comprises a first circuit with a heat source (gas boiler), a heat exchanger, a second circuit of the heat network, a...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | FIELD: heating.SUBSTANCE: essence of information-measuring and control system of optimisation of production and consumption of heat energy at the distributed facilities of heat supply comprises a first circuit with a heat source (gas boiler), a heat exchanger, a second circuit of the heat network, a temperature sensor in the straight pipeline of the first circuit, a temperature sensor in the return pipeline of the second circuit, a pressure sensor in the straight pipeline of the second circuit, a gas supply regulator, a gas flow sensor, a fan, an air temperature sensor, an air flow rate sensor, a temperature sensor of waste gases, a metre of produced heat energy, a multichannel microprocessor control unit of energy saving in production of heat energy, a memory unit, a control centre of receiving the information, a unit of control the combustion process in the boiler, a heat supply system, a control unit of heat energy consumption, and the first circuit with a heat source (gas boiler), the first output of which is connected to the input of the temperature sensor of waste gases and through the heat exchanger is connected to the second circuit of the heat network, is connected to the input of the temperature sensor in the straight pipeline of the first circuit, three outputs of the second circuit are connected to the inputs of the temperature sensor in the return pipeline, the pressure sensor in the straight pipeline, the metre of produced heat energy, the outputs of which are connected to the inputs of the multichannel microprocessor control unit of energy saving in production of heat energy, the output of the gas supply regulator by the of gas flow rate sensor is connected to the first input of the boiler, the output of the fan through the air temperature sensor, the air flow rate sensor is connected to the second input of the boiler, the outputs of the gas flow rate sensor, air flow rate sensor, air temperature sensor, temperature sensor of waste gases are connected to the inputs of the multichannel microprocessor control unit of energy saving in production of heat energy, the first output of which is connected to the input of the memory unit, the second output is connected to the input of the control centre of receiving information, the second, third, fourth inputs of the control centre of receiving information are connected to the outputs of the heat supply system by the control units of heat energy consumption, which fourth, fifth, sixth outputs of the |
---|