PROCEDURE FOR OPERATING GAS TURBINE INSTALLATION

FIELD: machine building. ^ SUBSTANCE: at stage of project development for gas turbine installation (GTI) there is preliminary designed operating mathematic model of GTI operation. During factory delivery testing, before commencement of operation there are additionally measured temperature of gases b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: INOZEMTSEV ALEKSANDR ALEKSANDROVICH, KHALIULLIN VITALIJ FERDINANDOVICH, VORONKOV VIKTOR EVGEN'EVICH, POLATIDI SOFOKL KHARLAMPOVICH, SAZHENKOV ALEKSEJ NIKOLAEVICH
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: machine building. ^ SUBSTANCE: at stage of project development for gas turbine installation (GTI) there is preliminary designed operating mathematic model of GTI operation. During factory delivery testing, before commencement of operation there are additionally measured temperature of gases behind a turbine of a gas generator t*T, absolute air pressure behind a compressor P*c, and atmospheric pressure Pa. There are determined reference values tT ref and Pc ref under a controlled mode at accepted atmospheric conditions. Further, daily, during operation and under the working mode of the gas turbine installation, there are measured current values of parametres nggÇèCUR, t*TÇèCUR, PcÇèCUR, t*inÇèCUR, PaÇèCUR on base of the first and the second functional dependencies with consideration of value öngg. There is calculated Pc pDayÇèCUR and tT modeÇèCUR. Also daily these parametres are compared with Pc ref and tT ref. There are gained values öPc=Pc pDay-Pc ref and ötT=tT pDay-tT ref, which in their turn are compared with preliminary specified values ö1 and ö2. Also, in case öPCëÑö1 and ötTëñö2, operation of the said GTI is continued without any restrictions. Yet, in case of öPCö2, the compressor is visually inspected for detection of damages. If damages are not revealed, gas-air circuit of the GTI is flushed. ^ EFFECT: raised reliability in determining necessity of engine flush due to increased accuracy and frequency of control over degree of dirtying during installation operation. Изобретение относится к области эксплуатации газотурбинных установок, в частности оценке технического состояния газотурбинного двигателя и осуществлению контроля степени загрязнения газовоздушного тракта двигателя. Технический результат - повышение достоверности определения необходимости промывки двигателя за счет повышения точности и частоты контроля степени загрязнения в процессе эксплуатации установки. Указанный технический результат достигается тем, что предварительно на этапе проектирования ГТУ формируют эксплуатационную математическую модель работы ГТУ, в процессе заводских сдаточных испытаний перед началом эксплуатации дополнительно измеряют температуру газов за турбиной газогенератора t*т, абсолютное давление воздуха за компрессором Р*к, атмосферное давление Рн, и определяют исходные значения tт исх, Рк исх на контролируемом режиме при принятых атмосферных условиях, далее в процессе эксплуатации, ежедневно, на эксплуатационном режиме работы газотурбинной установки осущест