METHOD FOR FACE DEVELOPMENT FROM EXCAVATION

FIELD: mining engineering. ^ SUBSTANCE: method comprises mounting of sections of powered roof support in the erecting room, a lava conveyor, a cutter-loader and a gripper pad, coal extraction using cutter-loader and formation of sections of seam roof powered support by means of separate entry ways a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUSEL'NIKOV LEV MITROFANOVICH, KOVAL' ANDREJ OLEGOVICH, RUDENKO ANATOLIJ GRIGOR'EVICH, PODOSENOV ALEKSANDR ALEKSANDROVICH
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: mining engineering. ^ SUBSTANCE: method comprises mounting of sections of powered roof support in the erecting room, a lava conveyor, a cutter-loader and a gripper pad, coal extraction using cutter-loader and formation of sections of seam roof powered support by means of separate entry ways and in each entry way by means of separate groups. The gripper pad sections are connected together by means of flexible coupling and the end sections are connected by means of pulling element with cable hoists located in the developing entry of the extraction pillar. After the gripper pad has been erected, the stress shall be created and hydraulic racks shall be actuated and the sections of lava conveyor shall be removed towards the future lava. In future, when performing the next entry ways in every two following entry ways the operation cycle concerning entry ways performing by separate groups of powered support section for lava seam roof shall be repeated. At the end of the last entry way performing before pulling the last group of powered support sections towards removed sections of lava conveyor the gripper pad shall be disassembled. Then these sections shall be pulled towards removed sections of lava conveyor and the process of formation of sections of seam roof powered support shall be finished. ^ EFFECT: improved efficiency and safety of formation of sections of seam roof powered support. ^ 3 cl, 22 dwg Изобретение относится к горному делу и может быть использовано для развития лавы из горной выработки, преимущественно из монтажной камеры, путем заезда механизированного комплекса под кровлю пласта в выемочном столбе. Способ включает монтаж в монтажной камере секций механизированной крепи, лавного конвейера, очистного комбайна и распорного устройства, выемку угля очистным комбайном и заводку секций механизированной крепи под кровлю отдельными заходками, а в каждой заходке - отдельными группами. Секции распорного устройства соединяют между собой гибкой связью, а крайние секции через тяговый орган - с лебедками, расположенными в подготовительных выработках выемочного столба. После монтажа распорного устройства создают распор, включают домкраты передвижения и передвигают секции лавного конвейера в сторону будущей лавы. В дальнейшем при выполнении остальных заходок в каждых двух следующих заходках цикл работ по заводке отдельными группами секций крепи под кровлю пласта лавы повторяют. На стадии завершения последней заходки до подтягивания последней группы секц