METHOD FOR RECOVERING SERVICEABILITY OF NUCLEAR REACTOR FUEL ASSEMBLY SUBCHANNEL

FIELD: nuclear engineering; retrofitting subchannels of high-power uranium-graphite tank reactor cores. ^ SUBSTANCE: proposed method for recovering serviceability of nuclear reactor fuel assembly subchannel includes reactor shutting down, dismounting of standard floor blocks from subchannel, and rem...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: BURKOV PETR ANATOL'EVICH, CHERKASHOV JURIJ MIKHAJLOVICH, STROGANOV ANDREJ ALEKSEEVICH, BYSTRIKOV ALEKSANDR ANATOL'EVICH, BALDIN VIKTOR DMITRIEVICH, POLJANSKIKH SERGEJ ALEKSANDROVICH, RJAKHIN VJACHESLAV MIKHAJLOVICH, SLEPOKON' JURIJ IVANOVICH, KURANOV VLADIMIR SERGEEVICH, DENEZHKIN VALERIJ IVANOVICH
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:FIELD: nuclear engineering; retrofitting subchannels of high-power uranium-graphite tank reactor cores. ^ SUBSTANCE: proposed method for recovering serviceability of nuclear reactor fuel assembly subchannel includes reactor shutting down, dismounting of standard floor blocks from subchannel, and removal of fuel assembly. Process channel is checked for serviceability. Channel is visually inspected within reactor for integrity and channel inner diameter profile is measured. Then process channel pre-removal operations are made. Process channel is removed from subchannel and placed in storage. Construction clearance between process channel and graphite stacking is recovered by calibrating graphite column including finishing of central bore internal diameter to desired size and expansion device segment is installed between guard plate and top graphite block. Graphite column is checked for condition by inspecting inner surface of column. Telescopic joint height and inner diameter of graphite column central bore are measured. Then process channel removed earlier and found serviceable by its check results is reinstalled in fuel assembly subchannel. After that final mounting operations are conducted including welding of process channel to adjacent structures and formation of nuclear reactor subchannel. ^ EFFECT: ability of evaluating process channel life, reduced dose rate on attending personnel. ^ 1 cl, 3 dwg